Thursday, April 24, 2025

Tenant Improvement Drain Installation

This Project can be called as project from the scratch


old restaurant demolish and excavate down to 3 feet depth tunnel as you can see

Inspector whose name Brian instructed us to change from ABS to PVC pipe because 

Can be brought up in detail

Wednesday, April 23, 2025

Old House Kitchen Remodeling

issue in this project
1. The wall we gonna break down is BEARING WALL or non bearing wall
After inspection, the wall turned out bearing wall
Thus we used and supported header 4 x 4 stud

2. 



///Old Kitchen entraped with wall converted to New Spacious Kitchen including Kitchen Island///
1. Decided to demolish the wall behind kichen for spacious view
2. Size decided as you can see with orange masking tape marks
3. There are several detail process upto finish view but I will have a chance to let you know later proper time
4. Finally as you can check through photos, NICE SPCIOUS KITCHEN VIEW including Kitchen Island
5. House was located in a city of Orange County
///House Remodel and Total Repair///


Before


 

Tuesday, April 22, 2025

Patio Door converted into Stucco wall





















 

Drawing Analysis (bakery Tenant Improvement)

 The drawing file you provided is a full architectural and interior design permit submittal set for Paris Baguette in North Hollywood (NOHO). Here's an analysis of the key elements:


πŸ”§ Project Overview

  • Project Name: Paris Baguette Tenant Improvement Project

  • Location: 6160 N Laurel Canyon Blvd, Suite 105, Los Angeles, CA 91606

  • Architect: AHK|Architecture, Sylmar, California

  • Permit Set Date: 9/30/2025


πŸ“ Plans Included

  • Existing Plan

  • Proposed Occupancy Plan

  • Equipment Plan

  • Kitchen Equipment Plan

  • Reflected Ceiling Plan

  • Roof Plan

  • Interior Elevations

  • Finish Schedule

  • Waterproofing and Construction Details


🧱 Room & Area Breakdown

SpaceArea (SF)Load FactorOccupancy
Seating Area3281/1522
Display Area4761/608
Kitchen7061/2003.5
Service Area2551/2001.3
Walk-in Cooler/Freezer (WIC/WIF)2481/3001
Hallway65--
Restroom144--

Total estimated occupant load: ~36.8 → rounded to 37


πŸ› ️ Construction & Wall Types

  • Interior walls: 3 5/8" or 6" metal studs @16" O.C., 1 layer of GWB per side

  • Furring walls with 2.5", 3 5/8", and 6" metal studs

  • Low walls to 36", 40", or 48" A.F.F.

  • Walls extend 6" above ceiling and are braced to structure

  • New ADA-compliant fixtures, including knee and toe clearance details


ADA Compliance

  • 1 accessible seat provided (min. required)

  • ADA lavatory and knee/toe clearance diagrams included


🧯 Materials & Finishes

  • Flooring: Concrete with sealer; quarry tile (Ashen Gray); porcelain (cool piazza)

  • Walls: Paint (SW Promar 200, BM Ultra Spec), FRP panels, glazed ceramic tile

  • Ceilings: Acoustic ceiling tiles, gypsum board soffits

  • Baseboards: Metal (blackened steel), ceramic cove base (Daltile)


⚙️ Equipment Highlights

  • Deck ovens (x3), U-ovens (x2), fryers, mixers (KSM8990), slicers, Turbo Air units

  • Detailed fixture schedule with lighting: LED track, downlights, hood lights

  • Mop sink and water heater area detailed with waterproofing membrane info


⚠️ Notable Code References

  • Accessibility clearances and fixture mounting follow CBC Section 404.2.4.1 (A)

  • Flame spread limits per CBC Table 803.11

  • LRV (light reflectance value) for food prep and restroom areas ≥70%

뢈루 μ˜€μ…˜ μ’…ν•© 건섀 쀑앙일보 μ—…μ†Œλ‘

 λΆˆλ£¨ μ˜€μ…˜ μ’…ν•© 건섀 쀑앙일보 μ—…μ†Œλ‘ 뢈루 μ˜€μ…˜


Kitchen Remodeling (Bayless)


 

Kitchen Remodeling Project


 

Garagy Epoxy Project


 

Wall Project


 

House Remodeling

///House Remodeling/// 2 units multi house totally remodelled Before remodel https://photos.google.com/.../AF1QipOM51xp8zYH... After re...